We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing facility in China with 5 various branches. For a lot more particulars: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
Optional top vertical motion tower concrete placing increase with 22.7m height and 29m and 33m positioning radius arm
29m 33m tower concrete inserting growth drawings
Tower Column hydraulic jack-up concrete placing boom, Self-climbing kind, climbing by flooring frame or by shaft frame. Mostly used for concrete putting of building venture, which includes civil design, plant development, bridge building, beam garden, nuclear electrical power plant, infrastructure, and so on.
Charactics
Modular design, mechanical and electrical integration handle, folding boom, tube column, floor frame and shaft frame. Integration of sophisticated features and product diversification, to accomplish a increased merchandise portfolio, boost the applicability of the merchandise.
Imported hydraulic and electrical factors, adopt quality fa EPT coupling for hydraulic pipelines, which is transformed rapidly, it can effectively resolve the issue of oil leakage in the procedure of assembling and dismantling, and keep away from the air pollution of the surroundings. Safety and reliability
sections R kind hydraulic increase, large circular arc, novel and beautiful appearance, compact composition, and the lightweight style of the increase, which lowered the excess weight of the whole device..
Simple to transport and set up.
Geared up with self-climbing frames which are driven by hydraulic and which climb up immediately from the present floor to the preferred flooring alongside the holes originally well prepared in elevator effectively, the putting booms increase with the climbing ground, saving time and labor.
Attributes
A.Boom
The arced boom structure is optimized by applying CPU design. The boom adopted high-strength steel plate for production with scientific process. It features beautiful appearance, superior rigidity and intensity, ensuring excellent and reliable quality.
B. EPT method
C series products adopted Germany Rexroth solenoid directional control valve and balance valve
with secondary overflow. It has effectively avoided the potential damages of boom
which might be caused by over speed movement when the boom drops down, and sudden
increase of oil cylinder’s pressure under external forces, thus the reliability of the boom
has been increased.
C.Internal EPT Oil Tank
Inner hydraulic oil tank renders a compact structure and free swivel. It gives big
convenient for installation, dismounting and maintenance, which ensure longer service
life and excellent performance.
D.Climbing Facility
As a rectangular frame structure, the climbing facility is flexible, reliable and convenient
for dismounting.
E.Slewing System and Reducer
Slewing reducer adopted products made by the world famous brand of Italy Comer, with
a great torsion. Being accompanied with the integrated slewing balance valve made by
Germany Hawei, it achieves smooth operation and reliable and stable performance.
F.Wireless Distant Controller
C series products adopt industry-exclusive analogue wireless remote controller made by ZheJiang TELECRANE, which is easy and convenient to operate, highly resistant to
disturbance and reliable in performance.Each series are accompanied with wired remote controller for use in necessity.
G.Electrical Control Method
The electric control system adopted world famous brand of electric components, such
as Japanese Omron and French Schneider. The multi automatic protection is set up in
the control program, so as to avoid misoperation and ensure the system’s reliability.
H.Column
The column is made of high-strength steel plate in square shape, with nice appearance,
rigidness and intensity, as well as high reliability.
Option:
u Inner-climbing frames: Flooring frames or Wall frames(Shaft frames)
u Column: 2m-10m.
u Mode of slewing: Gear slewing or rack & Bearing of stepless slewing.
u Voltage: 380V/50Hz or 440V/60Hz
u Radio remote Management: Tele Crane HBC or AUTEC
29m Tower Jack-up Concrete Positioning increase Requirements:
Model | Models | HGY29C | ||
Performance | Max.radius of positioning growth | m | 28.nine | |
Freestanding top (to the joint amongst the stop of the boom and swivel desk) | m | 22.7 | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | often close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total weight | kg | 19100 | ||
Counter bodyweight | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160M-four | |
Power | kW | 11 | ||
EPT program |
Pressure | MPa | 30 | |
Flux | l/min | eighteen | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control mode |
/ | Short-haul Manage /radio distant manage | ||
Pipeline cleansing | / | Damp cleaning/Dry cleaning |
||
Structure of tower body | / | Tubular column | ||
Section of tower physique | m×m | .75×0.75 | ||
Boom |
Shape | / | 3 hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT area | Duration | m | eleven.five | |
Articulation | ° | 0°~82.5° | ||
2nd segment | Size | m | 9.three | |
Articulation | ° | 0°~180° | ||
3rd area | Size | m | eight.one | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing manner | / | By hydraulic cylinder climbing |
|
Interval of climbing | m | .fifty two | ||
Floor frame | / | Hole well prepared in ground |
||
Shaft body | m | Gap prepared in floor two.~2.seven |
||
Min.Interval of climbing body | Climbing | m | three. | |
Placing concrete | m | six. | ||
Rest | m | 6.0 |
29m Inserting BoomWorking Range :
33m Tower Jack-up Concrete Inserting increase Specifications:
Model | Units | HGY33E | ||
Performance | Max.radius of positioning growth | m | 33 | |
Freestanding peak (to the joint in between the conclude of the growth and swivel desk) | m | 22.seven | ||
Boom articulation | ° | four hundred | ||
Slewing brake | / | usually close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total fat | kg | 21200 | ||
Counter fat | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor |
Model | / | Y2-160L-four | |
Power | kW | fifteen | ||
EPT technique |
Pressure | MPa | 30 | |
Flux | l/min | 18 | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM sixty eight | |
Circumstance temperature 5ºC-35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control manner | / | Quick-haul Handle /radio remote management | ||
Pipeline cleansing | / | Damp cleansing/Dry cleansing |
||
Structure of tower human body | / | Tubular column | ||
Section of tower entire body | m×m | .75×0.seventy five | ||
Boom |
Shape | / | 3 hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT area |
Length | m | twelve.38 | |
Articulation | ° | 0°~eighty two.5° | ||
2nd part | Duration | m | 10.ninety three | |
Articulation | ° | 0°~180° | ||
3rd area |
Size | m | 9.69 | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing method | / | By hydraulic cylinder climbing | |
Interval of climbing | m | .fifty two | ||
Floor frame | / | Gap ready in ground | ||
Shaft body | m | Hole geared up in ground two.~2.seven |
||
Min.Interval of climbing frame | Climbing | m | 3. | |
Inserting concrete | m | six. | ||
Relaxation | m | 6.0 |
33m Inserting BoomWorking Range :
Tower Column Concrete Positioning Growth Set up:
Tower Positioning Increase Work web site Functionality:
We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears factory in China with 5 various branches. For much more information: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of first tools manufacturer’s (OEM) part quantities or emblems , e.g. CASE® and John Deere® are for reference needs only and for indicating solution use and compatibility. Our firm and the outlined substitution elements contained herein are not sponsored, approved, or produced by the OEM.