With EPG brand registered in more than 70 countries like America , Europe , Japan and so on, it has partners among world top enterprises, such as JOHNDEERE, NEW HOLLAND, CLAAS, HONDA, KUBOTA, YANMAR, etc.
Overview
Quick Details
- Applicable Industries:
-
Manufacturing Plant
- Color:
-
Blue
- Application:
-
Machine Tool
- Ratio:
-
21342~7.25
- Product Keywords:
-
reductor
- Material:
-
20CrMnTi
- Packing:
-
Wooden Box
- Type:
-
Transmission Gear
- Weight:
-
20kg—2000kg
- Bearing:
-
NSK Bearing
- Keyword:
-
S series
Packaging & Delivery
-
Lead Time
: -
Quantity(Bags) 1 – 5 6 – 20 AND HI-TECH GEARING TECHNOLOGY Our Fellbach plant offers optimal engineering and manufacturing facilities for special gearboxes and gearing – from conception through to serial production.
>20 Est. Time(days) 7 20 To be negotiated
Online Customization
Product DescriIn our company we are aware of the importance of the users’ safety. That’s why our PTO’s are produced according to legal regulations and European directives and bear the CE sign. A key factor for safety assurance is the accession in the products’ development phase. By all means, the users’ knowledge about the correct use of a PTO drive shaft is vital. This means, that every users’ duty is to read and follow the safety instructions.ption
Our Factory
Packing & Delivery
Application area
FAQ
Q1: Are you trading company or manufacturer ?
A: We are a manufacturer in ZJ China.welcome to our factory to have a visit.
Q2: How we select models and specifications?
A:You can email us the series name & code (for example: WJ series woIt is our aim to supply a vast range of quality products at affordable prices, provide the best service for customers satisfied and contribute to our continued improvement. rm gearbox) as well as requirement details, such as motor power, output speed or ratio, service factor or your application…as much data as possible. If you can supply some pictures or drawings, it is better.
Q3: How is your price? Can you offer any discount?
A: We will give the best price we can base on your needs and the quantities.
Q4: How long should I wait for the feedback after I send the enquiry?
A: Within 12 hours.